How much does web app and MVP development cost in 2026
What goes into an MVP, how a web app differs from a SaaS platform in scope, when no-code is enough and which costs start after launch.
Published 5 min read
“Web app” can mean a landing page with a form, a client portal or a SaaS platform with pricing plans and thousands of companies inside. The scope between them differs tens of times over. Below is what each option includes, what drives the price and which costs appear after launch. Our package starting prices are at the end of the article.
Options and timelines
| What we build | Example | Time to launch |
|---|---|---|
| Landing page | Product page with a lead form and analytics | from 1 week |
| Web app MVP | Booking service, services marketplace, client portal | 3 to 6 weeks |
| SaaS platform | Subscription service with plans, teams and an API | from 2 months |
An MVP (minimum viable product) lets you test an idea on real users before investing heavily. It has one main scenario, accounts, a simple admin panel and payments if the product is paid. Everything else comes once it is clear what users will pay for.
A SaaS platform sells subscription access to many companies at once. On top of an MVP it adds plans and billing, teams with roles, data separation between customers, a public API and monitoring.
What drives the price
Scope of the first release
The number of scenarios moves the price most. “A customer picks a time and pays for a booking” and “a customer, a specialist and an admin work with schedules, discounts and reports” differ in scope several times over. That is why we start with research and a prototype: together we define what the first release has to prove and postpone everything that does not affect it.
Roles and data separation
One type of user is quick to build. Once admins, staff and customers with different permissions appear, the number of screens and checks grows. SaaS adds multi-tenancy: each company’s data is isolated from everyone else’s, and a mistake here is expensive, so it goes into the architecture from day one.
Billing
One-off payments are quick to connect. Subscriptions with trials, mid-month plan changes, promo codes, invoices for companies and payment retries need separate logic. Stripe or Paddle cover most international payments.
Integrations
CRM, email, messengers, calendars, accounting systems, AI services. Each integration is estimated separately: some services have a convenient API, others exchange files. Most integrations can move to a later stage.
Design
A ready component library works for an MVP and internal tools. A product that competes in a crowded market needs its own interface and design system, which is a separate budget line.
Load and data protection
A service for hundreds of users and one for hundreds of thousands are built differently. We design for the first thousands of users and do not pay for scale you do not have yet. Personal data, GDPR in the EU and similar laws elsewhere affect where data is stored and which hosting fits.
No-code or development
Builders like Bubble, Webflow or Tilda are good for testing demand in a couple of weeks: a landing page with a form, a simple catalogue, a survey. Custom development is needed when:
- the logic goes beyond what the builder can do, and every change becomes a workaround;
- the builder’s subscription grows with the number of users;
- you plan to sell the product or raise investment, and code ownership matters;
- you need your own integrations, roles or data storage requirements.
A common path: test demand with no-code, then build an MVP whose code can keep growing.
Running costs after launch
- Hosting and backups. An MVP runs on an inexpensive virtual server; costs grow with load.
- Payment provider. Takes a percentage of every payment, usually a few percent.
- Third-party services. Email delivery, file storage, monitoring, AI models. Many are free or cheap at the start.
- Further development. After launch you get data on how people use the product. Plan a monthly budget for improvements based on it.
How to stay within budget
- One scenario in the first release. Cutting scope is the most reliable way to move faster.
- Ready solutions for standard parts. Sign-in, payments, email delivery and analytics do not need to be written from scratch.
- A prototype before development. You can show it to users and investors, and changes in it cost a fraction.
- A success metric up front. Decide which MVP result means “we continue”, so you do not keep adding features blindly.
If the product is for your own sales and customer work, see also the article on custom CRM cost. If users will work from their phones, compare it with a mobile app.
How we estimate
After the brief we send an estimate: scope, stages, timelines and the amount for each stage. Research and prototype are a separate stage, and you decide on development after it. The amount is fixed before work starts, payment goes by stage, and the code and data are handed over to you. Below are package starting prices: the total depends on scope, roles, billing and integrations.
Service: SaaS and web app development
Packages and starting prices
Package prices come from our price list; the final amount is fixed in the estimate after the brief.
Landing page
from 1 weekfrom $41
- Design and responsive layout
- Enquiry form and analytics
- Publishing and domain setup
Online store
from 4 weeksPrice after a free estimate
- Catalog, cart and checkout
- Payment and delivery setup
- Integration with your accounting system or CRM
Web app MVP
from 3 weeksfrom $71
- Core flow, accounts and roles
- Admin panel and payments
- Hosting and monitoring
SaaS platform
from 2 monthsfrom $250
- Plans, subscriptions and billing
- Public API and integrations
- Analytics, monitoring and growth after launch
Prices are approximate: converted from roubles at the Bank of Russia rate of November 27, 2026 and rounded. The amount and currency of the invoice are stated in the estimate.
More about the service →Discuss a project
Describe the task and we will reply with questions and a timeline estimate.
Discuss a project →