How much does mobile app development cost in 2026
What drives the price of an iOS and Android app, what the App Store and Google Play charge, which costs start after release and when a Telegram Mini App is enough.
Published 6 min read
The price of a mobile app has three parts: the app on the phone, the server with data and an admin panel behind it, and the release to the stores. A coffee shop catalogue with takeaway orders and a delivery service with a customer, a courier and a dispatcher are both called “an app”, yet their scope differs several times over. Below is what moves the price, what the stores charge and what teams forget to budget for. Our package starting prices are at the end of the article.
Typical apps and timelines
| App | Example | Time to release |
|---|---|---|
| Catalogue with ordering and pay | Coffee shop, store, salon with online booking | 6–8 weeks |
| Service with accounts and plans | Gym with memberships, online course, clinic | 2–3 months |
| Platform with several roles | Delivery: customer, courier, dispatcher and admin | 3+ months |
The timeline runs from the brief to publication in the App Store and Google Play. If a backend already exists, for example a store whose website has an API, the app ships sooner.
What drives the price
Platforms and approach
There are two routes. Cross-platform development with Flutter or React Native produces one app for iOS and Android from shared code. Most business apps are built this way: catalogues, bookings, customer accounts. Native development in Swift and Kotlin means two separate apps. It costs more and is needed for heavy graphics, Bluetooth devices, advanced camera work and strict performance requirements.
If almost all of your audience uses one platform, the first version can ship for that platform only. This saves time on testing and review.
Screens and logic
Every screen needs design, layout, loading and error states, and checks on different phone sizes. A cart with promo codes, booking with a choice of specialist and time, or a support chat adds logic on the server and in the app. That is why we start with a clickable prototype: you open it on a phone, walk through the main scenario and cross out what can wait.
Backend and admin panel
An app needs a server: accounts, orders, catalogue, notifications. It also needs an admin panel where staff change products, prices and statuses. Building the server from scratch takes a noticeable share of the budget. If you already have a website or an accounting system with an API, the app connects to it.
Device features
Push notifications, location and maps, camera and QR scanning, Face ID sign-in, offline mode. Each feature is estimated separately. Among the common ones, offline mode takes the most work: data has to be stored on the phone and synced carefully once the connection returns.
Design
Standard iOS and Android components look familiar and are faster to build. A custom interface with animation and its own graphics takes more design and development time, and makes the app recognisable.
What the stores charge
| Item | App Store | Google Play |
|---|---|---|
| Developer account | $99 per year | $25 once |
| Fee on digital purchases | 15% up to $1M revenue a year, then 30% | 15% on the first $1M a year, then 30% |
| Subscriptions | 30% in the first year, then 15% | 15% |
In Apple’s Small Business Program subscriptions are also charged 15% from day one. The fee applies only to digital goods: subscriptions, paid content, in-game purchases. Payments for food, physical goods, appointments and other real-world services go through a regular payment provider, and the stores take nothing from them.
Two rules affect timelines:
- Apple reviews every update by hand. Review usually takes from a day to a few days, and a first release often comes back with comments. A company account needs a free D-U-N-S number, which takes from a few days to a couple of weeks to obtain.
- Google Play requires new personal accounts to run a closed test with at least 12 testers for 14 days before going public. Organisation accounts are exempt, so it pays to register one early.
Running costs after launch
- Server and storage. A small app runs on an inexpensive virtual server; user photos and videos need separate storage.
- Updates for new OS versions. Apple ships a new iOS every autumn, and Google Play raises the minimum Android version an app must target every year. Without updates, the app eventually stops being shown to new users.
- Crash monitoring and analytics. Free tools are enough at the start, but someone has to read the reports and fix the errors.
- Further development. After release, reviews and ideas come in. Plan a monthly budget for improvements.
When you don’t need an app
If customers already message you on Telegram and the scenario is simple (catalogue, order, booking, payment), a Telegram Mini App often does the job faster and for less: no stores, no review, nothing to install. More in the article on how much a Telegram bot or Mini App costs. For a B2B service people use at a computer, a web app with a responsive mobile version is usually enough.
A native app wins where push notifications, offline work, phone features and a place on the home screen matter: loyalty programmes, delivery, fitness, healthcare.
How to save
- One platform or a cross-platform build for the first version.
- A prototype before development. Fixing a scenario in a prototype costs a fraction of fixing it in a finished app.
- Your existing backend. If you have a website or an accounting system with an API, the app connects to it.
- A short first release. One main scenario; the rest comes in later versions based on user feedback.
How we estimate
After the brief we send an estimate: scope, stages, timelines and the amount for each stage. Design and prototype are a separate stage, and you decide on development after it. The amount is fixed before work starts, payment goes by stage, and the developer accounts and code stay yours. Below are package starting prices: the total depends on platforms, backend and device features.
Service: Mobile app development
Packages and starting prices
Package prices come from our price list; the final amount is fixed in the estimate after the brief.
Design and prototype
1–2 weeksfrom $71
- Flows and screens of the first release
- Clickable prototype on a phone
- Development estimate by stage
App MVP
from 6 weeksfrom $310
- iOS and Android, backend and admin panel
- Push notifications and payments
- Publishing to the App Store and Google Play
Prices are approximate: converted from roubles at the Bank of Russia rate of November 27, 2026 and rounded. The amount and currency of the invoice are stated in the estimate.
More about the service →Discuss a project
Describe the task and we will reply with questions and a timeline estimate.
Discuss a project →